The orange FG/SS is moving along. Frame has been prepped. Bottom bracket and crank have been installed. Seat post has been cleaned and polished. Stem and bars have had the anodizing removed and been installed. Brake levers and cabling have been installed. Bars have been wrapped.



Recent Comments